Granite Hills Regional Park - Water Bodies and Landscaping
×
Granite Hills Regional Park - Water Bodies and Landscaping
Client: The City of Whittlesea
Value: $990,000
This project is the first step in Council's flagship redevelopment project of the Granite Hills regional park in South Morrang. Field Form were engaged for the early civil and landscaping works package which involved the re-construction and development of two waterbody dams. Works included dewatering, flora and fauna collection, demolition, earthworks, installation of drainage infrastructure and swale drains. Landscape works include installation of concrete and gravel pavements, rock work and soft-landscaping.
Derby Street Outdoor Courts
×




Derby Street Outdoor Courts
Client: Hume City Council
Value: $560,000
The project involved the complete overhaul of exisiting outdoor tennis courts at Derby Street Reserve in Tullamarine. The new facilities included two tennis courts, and a share basketball/futsal court with striking 'art court' surfacing. Field Form were contracted to complete all the associated works including demolition, earthworks, pavement construction, drainage infrastructure and asphalting, along with fencing, acrylic surfacing and court side amenities.
Orrong Park Tennis Centre
×


Orrong Park Tennis Centre
Client: City of Stonnington
Value: $1,550,000
This prestigious tennis centre is located in Prahran's Orrong Romanis Recreation Reserve. The project included demolition and reconstruction of five shared tennis and netball acrylic courts. This included the construction of new playing surfaces, fencing, light towers, sheds, retaining walls, surrounding paths and drainage works. The site also had extensive contaminated materials that required removing and stabilising/capping to ensure the site was safe for future generations.
Wheelers Hill Primary School Synthetic Oval
×

Wheelers Hill Primary School Synthetic Oval
Client: Balmain & Co / VSBA
Value: $600,000
Construction of a new synthetic football ova and boundary running track. This included construction of a synthetic playing surface with vertical draining base and french drains. Field Form completed all associated demolition works, pavement construction, drainage infrastructure, asphalting, AFL goal post installation, and ancillary landscaping.
North Park Netball Courts, Stawell
×











North Park Netball Courts, Stawell
North Park Netball Courts, Stawell
Client: Northern Grampians Shire
Project Value: $1,560,000
Completed: May 2022
Field Form were engaged as the head contractor to construct three new acrylic surfaced outdoor netball courts on suspended concrete waffle slab with screw piers. This project included earthworks, screw piling, suspended concrete waffle slab construction, lighting, fencing, players shelters, synthetic turf spectator area, drainage, water fountains and contaminated soil removal works.
Client: Northern Grampians Shire
Project Value: $1,560,000
Completed: May 2022
Field Form were engaged as the head contractor to construct three new acrylic surfaced outdoor netball courts on suspended concrete waffle slab with screw piers. This project included earthworks, screw piling, suspended concrete waffle slab construction, lighting, fencing, players shelters, synthetic turf spectator area, drainage, water fountains and contaminated soil removal works.
Basil Oval Cricket Nets
×

Basil Oval Cricket Nets
Client: City of Stonnington
Value: $410,000
This project involved the reconstruction of 4 lane cricket net facility including demolition, earthworks, drainage, pavement construction, concrete slab, fencing, netting, synthetic turf and natural turf areas.
North Park Netball Courts, Stawell
×











North Park Netball Courts, Stawell
North Park Netball Courts, Stawell
Client: Northern Grampians Shire
Project Value: $1,560,000
Completed: May 2022
Field Form were engaged as the head contractor to construct three new acrylic surfaced outdoor netball courts on suspended concrete waffle slab with screw piers. This project included earthworks, screw piling, suspended concrete waffle slab construction, lighting, fencing, players shelters, synthetic turf spectator area, drainage, water fountains and contaminated soil removal works.
Client: Northern Grampians Shire
Project Value: $1,560,000
Completed: May 2022
Field Form were engaged as the head contractor to construct three new acrylic surfaced outdoor netball courts on suspended concrete waffle slab with screw piers. This project included earthworks, screw piling, suspended concrete waffle slab construction, lighting, fencing, players shelters, synthetic turf spectator area, drainage, water fountains and contaminated soil removal works.
Nazareth College Tennis Courts, Melbourne
×
Nazareth College Tennis Courts, Melbourne
Nazareth College Tennis Courts, Melbourne
Client: Melbourne Catholic Schools
Project Value: $510,000
Completed: August 2022
After a vigorous tendering process which included a complete redesign by Field Form in order to meet the Client’s budget, we were engaged to construct two new synthetic turf surfaced tennis courts at Melbourne’s prestigious Nazareth College. Construction of critical electrical works were undertaken during school holidays, and the remaining construction was safely managed during school term with as little impact on school operations as possible. This project included significant earthworks, retaining walls, storm water detention tank, concrete base, fencing and lightings works, along with the Field Turf Club 40 synthetic turf surface.
Client: Melbourne Catholic Schools
Project Value: $510,000
Completed: August 2022
After a vigorous tendering process which included a complete redesign by Field Form in order to meet the Client’s budget, we were engaged to construct two new synthetic turf surfaced tennis courts at Melbourne’s prestigious Nazareth College. Construction of critical electrical works were undertaken during school holidays, and the remaining construction was safely managed during school term with as little impact on school operations as possible. This project included significant earthworks, retaining walls, storm water detention tank, concrete base, fencing and lightings works, along with the Field Turf Club 40 synthetic turf surface.

North Ballarat Netball Courts
×


North Ballarat Netball Courts
North Ballarat Netball Courts
Client: City of Ballarat
Client: City of Ballarat
Completed: February 2022
Field Form constructed two new netball courts on concrete base for the North Ballarat Football and Netball Club adjacent the MARS stadium precinct. This project included significant earthworks, contaminated soil removal, in-situ lime/cement stabilization and crushed rock pavement construction. Field Form also completed the retaining walls, acrylic surfacing, lighting, fencing and players shelters with assistance for our experienced team of specialist subcontractors.
Client: City of Ballarat
Client: City of Ballarat
Completed: February 2022
Field Form constructed two new netball courts on concrete base for the North Ballarat Football and Netball Club adjacent the MARS stadium precinct. This project included significant earthworks, contaminated soil removal, in-situ lime/cement stabilization and crushed rock pavement construction. Field Form also completed the retaining walls, acrylic surfacing, lighting, fencing and players shelters with assistance for our experienced team of specialist subcontractors.
KP Hardimann Hockey Field, Reservoir
×
KP Hardimann Hockey Field, Reservoir
KP Hardimann Hockey Field, Reservoir
Client: Polytan / Darebin City Council
Project Value: $600,000
Completed: December 2020
Field Form were subcontracted to complete the extensive earthworks and civil construction components of the existing hockey pitch at KP Hardiman Reserve. Works included demolition, significant subgrade stabilization, drainage, retaining walls and pavement construction.
Client: Polytan / Darebin City Council
Project Value: $600,000
Completed: December 2020
Field Form were subcontracted to complete the extensive earthworks and civil construction components of the existing hockey pitch at KP Hardiman Reserve. Works included demolition, significant subgrade stabilization, drainage, retaining walls and pavement construction.
Netball Courts at Reservoir High School, Reservoir, VIC
×
Netball Courts at Reservoir High School, Reservoir, VIC
Netball Courts at Reservoir High School, Reservoir, VIC
Client: Darebin City Council
Field Form constructed two new netball courts and spectator areas on a ‘greenfield’ site at Reservoir High School, completing construction in January 2020. The project involved significant earthworks, base preparation and capping layer over contaminated material, crushed rock pavement, drainage infrastructure and concrete base – all of which were constructed by Field Form’s experienced staff. Lighting, fencing, acrylic surfacing and player shelters were installed by our team of specialised subtractors to top of these magnificent new facilities. See below link for media release regarding the project from the Premier’s office: https://www.premier.vic.gov.au/new-courts-double-netball-fun-reservoir-high
Client: Darebin City Council
Field Form constructed two new netball courts and spectator areas on a ‘greenfield’ site at Reservoir High School, completing construction in January 2020. The project involved significant earthworks, base preparation and capping layer over contaminated material, crushed rock pavement, drainage infrastructure and concrete base – all of which were constructed by Field Form’s experienced staff. Lighting, fencing, acrylic surfacing and player shelters were installed by our team of specialised subtractors to top of these magnificent new facilities. See below link for media release regarding the project from the Premier’s office: https://www.premier.vic.gov.au/new-courts-double-netball-fun-reservoir-high
Netball Courts at Cowes Recreation Reserve, Phillip Island
×
Netball Courts at Cowes Recreation Reserve, Phillip Island
Netball Courts at Cowes Recreation Reserve, Phillip Island
Client: Bass Coast Shire Council
Field Form completed demolition and the complete reconstruction of the Phillip Island Football and Netball Clubs competition courts from December 2018 through to April 2019. The project consisted of demolition of the existing dilapidated court facilities, and reconstruction of a concrete netball court facility complete with acrylic surfacing, fencing, players shelters and lighting. A new base pavement consisting of compacted crushed rock was constructed under the new concrete base, along with retaining walls and drainage upgrades in order to ensure longevity of use for the new courts. Significant challenges were faced on this project with the discovery of contaminated soils and asbestos containing material underneath the old court base. Fortunately, Field Form’s team are experienced and qualified in the removal of asbestos and contaminated soils, and were able to complete these risky works in accordance with all of Work Safe’s requirements.
Client: Bass Coast Shire Council
Field Form completed demolition and the complete reconstruction of the Phillip Island Football and Netball Clubs competition courts from December 2018 through to April 2019. The project consisted of demolition of the existing dilapidated court facilities, and reconstruction of a concrete netball court facility complete with acrylic surfacing, fencing, players shelters and lighting. A new base pavement consisting of compacted crushed rock was constructed under the new concrete base, along with retaining walls and drainage upgrades in order to ensure longevity of use for the new courts. Significant challenges were faced on this project with the discovery of contaminated soils and asbestos containing material underneath the old court base. Fortunately, Field Form’s team are experienced and qualified in the removal of asbestos and contaminated soils, and were able to complete these risky works in accordance with all of Work Safe’s requirements.
Central Park Netball & Tennis Courts – Horsham
×
Central Park Netball & Tennis Courts – Horsham
Central Park Netball & Tennis Courts – Horsham
Field Form completed the delivery of two shared netball and tennis courts at Central Park, Horsham, in 2018. This project involved demolition and reconstruction of as existing crushed rock court base to include compliant run off zones, improved drainage along with new netball goal posts and tennis net posts. Field Form also completed the installation of 3.6m high tennis fencing and oversaw the installation of asphalt and acrylic surfacing.
Field Form completed the delivery of two shared netball and tennis courts at Central Park, Horsham, in 2018. This project involved demolition and reconstruction of as existing crushed rock court base to include compliant run off zones, improved drainage along with new netball goal posts and tennis net posts. Field Form also completed the installation of 3.6m high tennis fencing and oversaw the installation of asphalt and acrylic surfacing.
St Kevin’s College Sporting Precinct – Melbourne
×
St Kevin’s College Sporting Precinct – Melbourne
St Kevin’s College Sporting Precinct – Melbourne
Field Form were contracted to complete nearly 6 months of laser grading on this multi-million dollar project. We successfully completed the grading of 3 soccer pitches, 1 AFL field, a half running track and a hockey pitch, all to the highest quality and competition standards.
Field Form were contracted to complete nearly 6 months of laser grading on this multi-million dollar project. We successfully completed the grading of 3 soccer pitches, 1 AFL field, a half running track and a hockey pitch, all to the highest quality and competition standards.
Netball Courts at Keilor Primary School – Keilor
×
Netball Courts at Keilor Primary School – Keilor
Netball Courts at Keilor Primary School – Keilor
Field Form were contracted to complete the subgrade preparation, base construction, concreting and drainage installation for two netball courts at Keilor Primary school. All the works were completed during the summer school holidays to ensure no disruption to the school term.
Field Form were contracted to complete the subgrade preparation, base construction, concreting and drainage installation for two netball courts at Keilor Primary school. All the works were completed during the summer school holidays to ensure no disruption to the school term.
Melbourne Girls Grammar
×
Melbourne Girls Grammar
Melbourne Girls Grammar
Field Form completed the base preparation, laser grading and drainage for three netball courts at the prestigious Melbourne Girls Grammar school in 2018.
Field Form completed the base preparation, laser grading and drainage for three netball courts at the prestigious Melbourne Girls Grammar school in 2018.
Ashwood Netball Courts’
×
Ashwood Netball Courts’
Ashwood Netball Courts’
Field Form were contracted to complete the earthworks, base preparation, laser grading and drainage for this impressive 12 court netball facility at Ashwood. The large sloped site required extensive earthworks and retaining wall structures, all of which Field Form completed.
Field Form were contracted to complete the earthworks, base preparation, laser grading and drainage for this impressive 12 court netball facility at Ashwood. The large sloped site required extensive earthworks and retaining wall structures, all of which Field Form completed.
Bowling Green – Brighton
×
Bowling Green – Brighton
Bowling Green – Brighton
Field Form were contracted to complete the base preparation and laser grading of this prestigious lawn bowls green.
Field Form were contracted to complete the base preparation and laser grading of this prestigious lawn bowls green.